Objectives
- Continue to develop proposals to re-route the main road to the Hub Station alongside the A52;
- Work with local and national agencies to develop a LCWIP (Local Cycling and Walking Infrastructure Plan) for the Area that addresses expected needs for the next 20 years;
- Develop outline proposals for the road network through the Barracks as well as the access to Toton Lane / Stapleford Lane.